The land area used by this power plant is 300,000 square meters. The use of the most experienced design, implementation and supervision team, as well as the use of advanced equipment and items produced with the latest technology in the world, has maximized the efficiency of this project. The geographical location of the power plant and the infrastructure provided are important features of this project.
The studies of this project began in 1404 with the use of experts and consultants from the industry and were implemented in 1405. According to the plans, it will be put into operation in the spring of 1406. Nearly 20,000 billion rials of investment are required for the construction and operation of this power plant, which has been provided from personal capital and bank facilities. The electricity generated by the power plant will be offered through the energy exchange and applicants can upload their application through this site.
For the operation and maintenance of the power plant, the maintenance and repair department (NET) of the power plant has been established, and one of its duties is to request the parts and equipment needed during the installation and operation period. Therefore, applicants can order the power plant items they need through this site.
The land area used by this power plant is 300,000 square meters. The use of the most experienced design, implementation and supervision team, as well as the use of advanced equipment and items produced with the latest technology in the world, has maximized the efficiency of this project. The geographical location of the power plant and the infrastructure provided are important features of this project.
The studies of this project began in 1404 with the use of experts and consultants from the industry and were implemented in 1405. According to the plans, it will be put into operation in the spring of 1406. Nearly 20,000 billion rials of investment are required for the construction and operation of this power plant, which has been provided from personal capital and bank facilities. The electricity generated by the power plant will be offered through the energy exchange and applicants can upload their application through this site.
For the operation and maintenance of the power plant, the maintenance and repair department (NET) of the power plant has been established, and one of its duties is to request the parts and equipment needed during the installation and operation period. Therefore, applicants can order the power plant items they need through this site.